Battersea Power Station

Plumbing Works

INTRODUCTION


TF Energy successfully completed commercial plumbing works for London's high-end coffee shop at Battersea Power Station. The £10,386 project involved installing complete hot and cold water systems, waste connections, and sanitary fixtures. Despite challenges with client design changes

and restricted drilling hours, the project was delivered within the 5-day timeframe. The client was extremely satisfied, leading to further project commissions.

Client Details

Client: Arabica London

Funding: Private /

Independent

Project Cost: £10,386

Completion Date: 7th

December 2024

Problem Statement

New high-end coffee shop recently took over lease of this property within

Battersea Power Station mall. Required a complete water system for all elements necessary for a functioning retail coffee

shop.

Solution Provided

Installation of all new hot & cold pipework throughout the commercial unit,

connecting onto communal network using electric fusion fittings. Complete

system for toilets, basins, water supply to appliances, and waste management.

Project Overview

Installation Details

  • New waste systems servicing three WCs
  • Island kitchen area connections
  • Integration of five existing waste tails into communal network
  • Hot and cold-water supply to kitchen island and WCs
  • Mop sink installation in back-of-house area

Value-Added Services

Beyond the physical installation, TF Energy provided design assistance to ensure the final plumbing layout met the client's operational needs. This consultative approach ensured the

delivery of a high-quality, fully functional system that precisely matched the. requirements of a busy coffee shop environment.

Client extremely satisfied and have already instructed further projects following the successful completion of works.

Challenges & Solutions

Design Revisions

Despite having confirmed initial designs,

frequent client revisions required

continuous adjustments during the first-fix installation, adding complexity to the workflow and installation process.

Site Restrictions

The site's location within the Battersea Power Station compound imposed strict drilling hours (8:00am 3 10:30am), making scheduling and installation more challenging. Careful planning and adaptability were essential to keep the

project on track.

Solution Approach

Efficient Scheduling

The project was successfully

delivered within the allocated

timeframe of 5 working days,

with TF Energy working

unsociable hours to ensure

maximum efficiency and ensure

works could be undertaken

without delays or distractions.

Compliance & Documentation

All testing and commissioning certificates were issued, with

continuous communication and

sign off with Building Management at each important stage to verify correct installation. The plumbing

system was fully chlorinated, tested, and certified upon commissioning.

Client Management

There is a fine line between allowing ad-hoc changes to confirmed designs due to unforeseen challenges and accommodating a client's changing preferences. However, we manage client expectations through honest communication, encouraging careful consideration of designs before approval, enabling our teams to complete the required work successfully.

Conclusion

The Battersea Power Station project for Arabica London demonstrates TF Energy's ability to deliver high-quality commercial plumbing solutions even when faced with significant challenges. By maintaining clear communication with both the client and building management, working flexible

hours to accommodate site restrictions, and providing expert design consultation, the project was completed to the client's complete satisfaction. The success of this installation has already led to additional project commissions from the same client, highlighting the value of TF Energy's professional approach and technical expertise in commercial plumbing installations.